Contact 1-800-314-3578
Slant/Fin® Victory II VHS VHS120EP Gas Boiler, 84.5 % AFUE, 120000 Btu/hr BTU, 115 V, 1 -Phase, Natural Gas Fuel
The VHS boiler has contractor friendly features for speedy installation and reduced service time. Design innovations developed with the installer in mind make the VHS easier to install and service. The VHS can be vented though the side wall or though the roof with power (pressure) venting. Some VHS models 2021 compliant.
Slant/Fin® Victory II Gas Boiler, Series: VHS, 115 V, 60 Hz, 1 -Phase, 84.5 % AFUE, 120000 Btu/hr BTU, 1-1/2 in FNPT Connection, Natural Gas Fuel, 100000 Btu/hr DOE, Intermittent Pilot Ignition, Cast Iron Housing, 17-1/8 in W x 28-7/16 in H x 19-3/4 in D
AFUE Rating | : | 84.5 % |
BTU Rating | : | 120000 Btu/hr |
Connection Type | : | 1-1/2 in FNPT |
DOE Heating Capacity | : | 100000 Btu/hr |
Dimensions | : | 17-1/8 in W x 28-7/16 in H x 19-3/4 in D |
Frequency Rating | : | 60 Hz |
Fuel Type | : | Natural Gas |
Ignition System | : | Intermittent Pilot |
Material | : | Cast Iron Housing |
Phase | : | 1 |
Voltage Rating | : | 115 V |